Hi Rui,
No I don't need to modify or edit existing metadata.
My situation is that we have done measurement from two controllers (both TSC3) and therefore have two separarte jobfile. In oure case it would be nice to have these two jobfiles in the same jobfile but in a way where you still is abel to see metadata for every point number.
In the particular case we do mesuremet of streams. For that kind of job it is importent to keep point number in a continuous course: 1, 2, 3,4,5.........and so on. To combine two jobfiles into one jobfile you sometimes have to change point number such that point number fit together. For this operation it just would be nich if metadata was following the original mesured point.
Thanks for your help
Allan