Trimble Business Center

 View Only
  • 1.  Takes offs in TBC-HCE

    Posted 02-16-2017 10:18

    How many people here use TBC for takeoffs?

    I’m doing a takeoff with boreholes, site stripped to upper most stratum. Sheet2 of the attached excel spread sheet shows the correct information as to what materials of the site are being excavated via bore holes. When you go to sheet3 or 4 with the individual areas some are showing bore volume cut information then other areas are showing “On-site Topsoil” when it should be showing bore hole volumes as the site has already been stripped… Here is the link to the VCE so you can see the strata surfaces etc. I wouldn't* suggest trying to run a report unless you have a while. It takes a LONG time... 

    https://whitcon.sharefile.com/d-s0ea16e5b09a4342b 

     

    Is this project just too much for TBC to handle?