Does anyone know how to export Utilities against an alignment string, to determine station/chainage against different alignment, to allow then to be uploaded into TILOS as different sub projects
Example require the following information or in a similar format in excel :
Note start and end chainages might not be the actual length as the pipe could be diagonal to the road chainage
Station - Start | Station - End | Pipe Run Name | Pipe Length QTY | String Reference Tilos SubProject | Average Depth |
---|
400 | 420 | SWMH 1 - SWMH 2 | 33.5 m | Master Alignment 1 | 1.5m |
10 | 50 | SWMH 10 - SWMH 12 | 50m | Master Alignment 2 | |