What the steps of process static data and what the adjustment steps and what the setting that i have to keep it in TBC setting for to get first order control point and for your information i observe phase 1 for 24 hours to get the first solution from knon

Question asked by Faisal Al-Balushi on Mar 21, 2020


Hi how i can prepare the TBC setting for the below project and what the TBC steps for process and adjustment the static data 

Project specification :

          • Second order (Horizontal) GNSS Survey General Specifications:

 

Sl/No.

Specification - General

Static

1

Minimum number of reference stations to control the project

3 NSA first order(Horizontal)

2

Maximum distance between the survey project boundary and network reference control station

70 to 80 km

3

Location of reference network control (relative to center of project) minimum number of “quadrants” not less than

3

4

Minimum percentage of all baselines contained in a loop

100%

5

Direct connection between survey stations which are closer than 20 percent of the distance between those stations traced along existing or new connections (adjacent station rule)

Yes

6

Minimum percentage of repeat independent baseline

5%

7

Minimum number of independent occupations per station

100% (2 times) 10% (3 or more times)

8

Direct connection between inter-visible azimuth pairs

Yes



  • Second order (Horizontal) GNSS Survey Field Specifications:

 

Sl/No.

Specification - Field

Static

1

Maximum PDOP during station occupation

7 (75% of times)

2

Minimum observation time on station

1 hours

3

Minimum number of satellites observed simultaneously at all station

6 (75% of times)

4

Maximum epoch interval for data sampling 

15 seconds

5

Minimum time between repeat station observations

45 minutes 

6

Minimum number of primary control stations

=>3

7

Minimum length of observations

=>24 hours

8

Antenna height measurements in meters at beginning and end of each session (2)

Yes

9

Minimum satellite mask angle above the horizon (3)

10⁰

 

  • Second order (Horizontal) GNSS Survey Office Specifications:

 

Sl/No.

Specification - Office

Static

1

Fixed integer solution required for all baselines

Yes

2

Ephemeris

Broadcast

3

Initial position: maximum 3D position error for the initial station in any baseline solution ( Navigation position)

20 meters

4

Loop closure analyses, maximum number of baseline peer loop

8

5

Maximum loop length 

75 km

6

Maximum misclosure peer loop , in terms of loop length

50 ppm

7

Maximum misclosure peer loop in any one component (x,y,z) not to exceed 

8 cm

8

Repeat baseline length not to exceed

50 kilometers

9

Repeat baseline difference in any one component (x,y,z) not to exceed

50 ppm

10

Maximum length  misclosure allowed for a baseline in a properly –weighted, least squares network adjustement

50 ppm

11

Maximum allowable residual in any one component (x,y,z) in properly-weighted, least squares adjustment

8 cm

Outcomes