Subgrade Layers in TBC

Question asked by Saif Bin Darwish on Nov 4, 2017
Latest reply on Nov 11, 2017 by Joseph Torres

Look at the segment 17-18. I have given a specific offset of 3.845m and slope 2% to make it terminate at the Finished slope. If I have to add further Embankment layers at say 30 Cm Offsets lower down, I will have to compute the lengths for each segment. This defeats the purpose of the Software itself.

In Terramodel, I  assign a segment length of say 50m and place them inside the Finished surface and the segment terminates at the slope automatically. I did not find TBC behaving as well !!
Do you or some one in Trimble has a trick up his sleeve?