AnsweredAssumed Answered

Updating a corridor model due to settlement

Question asked by Patrick L'heureux on May 10, 2019
Latest reply on May 10, 2019 by Alan Sharp

We have a project where we have already installed the northbound side of the highway. The issue is that it has settled. We therefore need to update our model to match the settled section for installation of the southbound lanes holding this new ep breakline and the slopes from the original model. 

 

Here is how I think I should go about it. I was able to make adjustments in 20 minutes to 2700 ft of highway with multiple lanes. Has anyone run into a similar situation? Am I on the right track or is there a better way?

 

Thanks!

 

Outcomes