When creating an alignment from an elevated line, how can I get the vertical stationing to match the horizontal stationing?  It always starts at 0+00 and can't be blanket changed by changing the first station, like you can in the horizontal tab.  Unless I'm missing something.  This is being done to create curb and sidewalk alignments for a clients Topcon machine and they've been having problems with the machine locking up when stationing is going negative, if they adjust in the field, say 50 ft. to blend into existing match points, so instead of starting alignments at 0+00, we want to start them at 100+00 both on the horizontal and vertical to eliminate going negative on stationing.