How can you change the point quality of multiple points in a TBC project without going one by one and changing each individually? Is there a way to do this with a whole group of points?

Question asked by Owen Mullinax on Jan 22, 2020

Say you have points 200-300 stored in a TBC job, grid, set to control quality. You want to change these to Survey or Unknown without going through the project explorer one by one. Is there a way to do this as a batch process? One can always export, delete them, then re-import to correct quality, but that is a bit of an absurd way to do something that should be simple.