Trimble Business Center

 View Only
Expand all | Collapse all

Closed Loop Corridors

  • 1.  Closed Loop Corridors

    Posted 03-22-2023 16:03
      |   view attached

    Are these things always a disaster built as a corridor? I always feel there are issues when I do this. Not sure what's wrong with this corridor but we've got a million flags.

    The attached VCL should import everything 



    ------------------------------
    Adam Bower
    ------------------------------

    Attachment(s)

    zip
    Circular Corridor.zip   197 KB 1 version


  • 2.  RE: Closed Loop Corridors

    Posted 03-23-2023 07:47

    The easiest fix is to just shorten the last segment in the alignment by 0.01 ft. (so it's not a closed alignment)

    Plan B would be to put a null template near the end of the alignment.



    ------------------------------
    Gary Lantaff
    ------------------------------



  • 3.  RE: Closed Loop Corridors

    Posted 03-23-2023 12:53

    Thanks for the tip, let me try to shorten the last segment



    ------------------------------
    Adam Bower
    ------------------------------



  • 4.  RE: Closed Loop Corridors

    Posted 03-24-2023 18:16

    Following this thread to see how this correct.  I did do a sampling distance override in the corridor template setting and had several flags get removed.  I exported the surface and reimported the surface.  Looked fine.

    roundabouts, never had issue as I closed short from the star of the alignment.  I also use 3D lines to create my corridors by means of the SIDE SLOPE tools.  



    ------------------------------
    Francisco Guerrero
    ------------------------------



  • 5.  RE: Closed Loop Corridors

    Posted 03-23-2023 13:52

    Hi Gary,

    is there any talk of having a closed alignment feature in TBC in the future? if not I would like to request it. I am constantly getting closed alignments from other packages (12d mostly) with the last elements been omitted Apon import. I spend a lot of time correcting this for roundabouts, islands, loop roads, basins and dams.

    thanks 



    ------------------------------
    Peter Batson
    ------------------------------



  • 6.  RE: Closed Loop Corridors

    Posted 03-23-2023 19:15

    Hey Peter,

    Supporting the closed flag on alignments from 12D is fairly near the top of our development list. Feel free to email me any sample data.



    ------------------------------
    Dylan Towler
    dylan_towler@buildingpoint.com.au
    https://tbcanz.com/anz-toolbox/
    ------------------------------