I am asked to produce a "Mass Haul Diagram" for an area of about 1.5 Km by 900m. I have the Existing Ground Level, Rough Grading Level and Finished Ground Level surfaces. The job involves cutting / Stripping ground from Existing Levels to the Rough Grading Levels and then Filling to Finshed Ground Levels.
Anyone with some ideas?
My search on google only has details for a Road or Railway type of work.
All help thankfully welcome.
------------------------------
Saif Bin Darwish
------------------------------