There have been times , when a project has been made, fabricated and shipped and installers notice a beam is missing. It is not from the point of the fabricators but the engineer didn't include the drawing or didn't take into consideration something on the ground at location. In saying all that , a new piece whether a beam or column has to be added to the project. How do I had to the exiting project and not have to make a sequence or phase for one or two pieces. I can add the material to the existing job and make a cut list.
thank you so much
------------------------------
Bobbie Cook
------------------------------