Must actions always be added on a per-project basis? Our TC models are created and uploaded with Tekla Structures and PowerFab. The latter has an integration with Connect that supposedly maps its stations to statuses in connected jobs, but this doesn't seem to work (confirmed broken by Tekla support). Do higher-level settings exist that can achieve the same thing?