Version 2020.0.12
Release date: 2024-09-30
Support AutoCAD 2025.
Implemented addition of SNDWAIT in configuration file to add possibility of delay in saving boreholes for slow server responses.
Method abbreviation Tr or TrS is displayed instead of T in borehole list.
Drawing 3d cylinders for ground water pipes in Civil 3D now starts at top level of pipe instead of ground surface.
Bugfix: In measurement module, GW with filter now displays level at bottom of filter when it is dry.
Bugfix: Core drilling and soil-rock drilling could cause an infinite loop if there were different interpretations of bedrock level.
Bugfix: Drawing boreholes in 3D view (Cylindrical in Civil 3D), could create a 0.1m layer of unknown material at the bottom of the cylinder.
Bugfix: Piles with top below ground surface is now handled correctly.
Bugfix: Soil division depth at pile top caused a segment with length zero to be created, it is now resolved.
Bugfix: Existing calculation points/loads window had long loading times for large screen resolutions, it is now resolved.
Calculated OCR values using normalized pore pressure ratio could display very high values that were not of interest. Therefore, the presented OCR is now trimmed.
Bugfix: Calculating undrained shear strength using Nkt could cause crashes.