We use cookies to personalise content and ads, to provide social media features and to analyse our traffic. We also share information about your use of our site with our social media, advertising and analytics partners.
Learn more
Accept Cookies
Skip to main content (Press Enter).
Sign in
Skip auxiliary navigation (Press Enter).
Terms and Conditions
Skip main navigation (Press Enter).
Toggle navigation
Home
Communities
My Communities
Distributor Communities
Public Communities
User Groups
Participate
Help/FAQs
Getting Started Guide
Advanced Tutorial
Communities
Community Home
Library
View Entry
Novapoint Water & Sewer Library
Back to Library
Settings
Recommend
04-12-2021 16:32
David Kosakowski
Settings
The function is run from the following locations:
This dialogue includes the following settings:
Pipe text in the plan view.
Frostproof depth in the project. Sets the depth of the ditch in the construction.
If the longitudinal gradient of the pipes is to be locked to a certain (least) value, this check box should be marked.
Rock shelf width in combined (rock/soil) ditches.
Pipe diameter to be exceeded in order to deduct volume from reported volumes of crushed stone surrounding the pipes in the ditch.
Statistics
0 Favorited
25 Views
0 Files
0 Shares
0 Downloads
Related Entries and Links
No Related Resource entered.
Copyright 2023. All rights reserved.
Powered by Higher Logic