The Task tab contains all the important input parameters. This fills the basic descriptions for the model in the Design tab. A Task consists of the following input boxes (below): Task, Reference Alignment, Road Standard, Select Data, Features, and Finish.
Template (only available when creating new road models)Templates will fill in the necessary data for the road model. The default template is an empty template. To build up a road model based on data from another project using the template From Existing Project.Choose a user-defined template if available.
NameSpecify a name for the road model. This can be changed later.
Subtask ofSpecify the subtask in the process structure where the road task is to be stored. All tasks can be moved later by drag-and-drop.DocumentationAdd information about the task and attach files as documentation.
Starting the tasks Settings (for the task) lets you change data globally for the task.
Choose a Line task with an alignment as a reference line for the road model and specify the From and To. Check the box Full length if this is wanted.Vertical OverrideOverride the vertical alignment to follow the terrain by a specified distance.
Specify the Road Normal and Class for the road. Road Normal and Class can be changed at a later stage and recalculates the typical cross-section.Check the boxes for Superelevation and Widening if needed. The checkboxes are only available when creating a road model. To recalculate superelevation and widening access dialogs from Settings.SettingsThis drop-down menu accesses the Design Standard dialog if there is a need to specify the input to the road model. The Typical cross-section and Superelevation and Widening dialogs are also available from the drop-down menu.
Define the calculation basis and illustration objects of the model.
Define the rules for Rules for Result and input data.
PreviewUse this action to temporarily build and preview the model. A new preview window will open. If an existing View in 3D already contains the road model, then no preview window will be opened. Instead, go to the correct window and zoom in on the model.FinishUsed to save changes and build the model. Changes will be stored to the task.CancelUsed to cancel the task.This will revert all changes done inside dialogs and tasks since opening the task. If there have been changes to user will be given a warning.Checkboxes