Novapoint Water & Sewer Library

Window 

04-16-2021 08:35

This menu has the following sub-selections:

Close Vertical Drawing

This function is used for closing the vertical window of the construction.

Run the function from the following location:

Menu Novapoint WS Construction > Window > Close Vertical Drawing

Refresh Vertical Drawing

The function is used for refreshing the vertical window of the construction, included printing of station numbers and elevation in a readable size according to the at any time visual cut.

Run the function from the following location:

Menu Novapoint WS Construction > Window > Refresh Vertical Drawing


Horizontal Drawing

This function is used for changing the horizontal window when the vertical window is current.

Run the function from the following location:

Menu Novapoint WS Construction > Window > Horizontal Drawing

Vertical Drawing

This function is used for opening the vertical window, or for changes to the vertical window when the horizontal window is current.

Run the function from the following location

Menu Novapoint WS Construction > Window > Vertical Drawing

Statistics
0 Favorited
13 Views
0 Files
0 Shares
0 Downloads

Related Entries and Links

No Related Resource entered.