Hello, I am very new to using Trimble surveying equipment. I surveyed river cross-sections for a project that we are working on. When I try to process the baselines I get very poor precision (1.4 m - 4.5 m).
My workflow is as follows:
Import survey into TBC
Download base station site data for the closest site
process baselines by selecting all the lines except the one control point I surveyed.
Additional info:
GNSS unit - Trimble R4.
One control point surveyed, but I haven't done anything with the point or specified the coordinates.
The calculation method when processing baselines comes back as type 'float', from what I was able to work out this should be 'fixed'?
Thank you