So I have crews that shoot things like utility poles or light poles several different ways, one crew shoots them reflectorless, another shoots them reflectorless with a prism offset to get the center of the pole, another puts the rod right up against the pole, and yet another will take 2 shots say 2' on either side of the pole and then average the point. I don't have a problem with any of these methods. However when I bring the job file with the "averaged" points into TBC it gets treated as a meaned angle which throws error flags which cause me problems when doing a network adjustment. Is there something I could do field wise or in TBC to resolve this? I assume I can tell the crew to use "store another" instead of "average" and average it myself in TBC but is there something I can do in TBC?, I currently have a project with about 75 of these types of points. Exploding them doesn't help as I get 2 points only a hundredth or two apart and still have a meaned angle.