I have a traverse that was ran with an SX-10. the initial set up was 1 backsighted 2 then went 3,4,5,6,7,502,501. 502 was point 2 and 501 was point 1. When i go to adjust the traverse it does not see the closing angle. Any thoughts suggestions. i have attached the .jxl and .job file.