I processed some GNSS data from yesterday (July 7, 2020; day 189) in TBC 5.20. I use the baseline processing report in my workflow, it is a critical link between the processing in TBC and everything I do with the data.
All of the baselines show up in the report as processed, but all of the times (start/stop, and when processed) show up as "invalid leap seconds". The data consists of 6 .dat files, and 4 rinex files. All of the rinex files have a leap seconds record in the header.
By not having the start/stop times, it breaks my workflow.
