So I did a quick test this morning, I created 3 corridors from the same HAL VAL (Always Node 1) and added the same 4 reference lines to each corridor and selected them in the same order (left to right) for each corridor and they always became nodes 2,3,4,5 in the same sequence.
I also created a corridor and then selected them Right to left and the Right most line became 2 and then 345 as expected.
The Reference lines are added sequentially based on the order in which you select them, starting at the next available node number.
So it seems that if you do this at the start that this will work today. If you have already added a Node 2 or 3 and then add ref lines they will take the next available number in the sequence.
Alan