What version of TBC are you running?
The Earthwork Report command allows you to select multiple boundaries. Is that the command you are using?
The Takeoff Report command creates a new surface with the materials removed then does a surface to surface computation. This would typically be slower than the Earthwork Report command. The advantage is that it will sum all of the areas. Using the Earthwork Report creates a report section for each boundary but does not add them all together.
The Corridor Earthwork command can be used if you have multiple subgrade layers in your corridor. If you use the excel option for reporting you will get both the volumes and surface areas for each boundary you select. When multiple boundaries are selected then each one is presented on a new tab.
Hope this helps.
tim