TBC Import Error "The Last station '50' does not match the resection point '55'

  • 1.  TBC Import Error "The Last station '50' does not match the resection point '55'

    Posted 11-08-2018 06:35

    Quick explanation

     

    In the field, we collected control with GPS, exterior to a substation, then interior with S6 / SX10, we RESECTED from said exterior control. With the S6, I resected point 50, in order to do ground surveying while the SX10 was elsewhere. I then occupied point 55 with SX10 but… called the point 50, then after finishing the Resection, I went into Point Manager, highlighted point 50 and clicked on the Point 50 and then clicked Point Names and changed it to 55. No problem. Completed all of the scanning and ground surveying and left site. Scan looked good on controller. However, this morning, when I import the job file into TBC I am receiving the message "The last station '50' does not match the resection point '55'! I’ve gone so far as importing a CSV with all control points and setting them as Control Quality, then importing the .job file. I’ve also tried importing the .jobxml file, same error! Oddly enough, RealWorks imports the point cloud and all of the data is there, however, it gives me the Scale of 1, Ground / Grid Coordinate box. Thusly, why I  need to import to TBC, then export, lol. Grrr….  Any ideas? Thanks.



  • 2.  Re: TBC Import Error "The Last station '50' does not match the resection point '55'

    Posted 11-08-2018 08:22

    It's a little difficult to follow all what you did and are seeing, but I don't think Access will work properly (or likes) if you rename a point that was used for total station data collection. You could try to go back into Access and rename 55 back to 50 and see if that makes a difference.



  • 3.  Re: TBC Import Error "The Last station '50' does not match the resection point '55'

    Posted 11-09-2018 16:14

    Since this is a Trimble Access and Survey Data Processing question it should really be asked on the TBC for Geospatiial Forum as they have the people on their team that really know the Trimble Access / Survey Controller software and how it interacts with the TBC Survey Data Processing software. 

     

    Apologies but without a lot of work on my side to come up to speed with all of the Survey Parts you mention, I am not really equipped to assist you. 

     

    Please go to Find Answers to get your question reviewed by the Geospatial team (this is the Geospatial Forum)

     

    The Business Center - HCE forum will answer all of your construction focused questions relating to Civil Construction products and capabilities including e.g. Data Prep, Takeoff, Corridors, Surface Modeling, Volumes, reporting, Interfacing to SCS900, Siteworks, GCS900, PCS900, Earthworks, Site Pulse and DPS900 / Groundworks products. 

     

    If you cannot get an answer there, please come back to me and I will see what I can do to assist you further next week

     

    Alan