I'm curious if anyone has any tricks for creating a takeoff site improvement that has a material where the depth has a maximum value or stops at original ground (or stripping). For example if you have a building pad that has 8" of concrete, 12" of gravel, and then structural fill down to a max depth of 6'. If you put in 6' as the depth it will create a cut if the 6' goes below original ground. As far as I know there is no property or setting that allows it to be clipped at the original ground?
Seems like that would be a useful feature to add in if it doesn't already exist.
------------------------------
Wayne Welshans
------------------------------