Hello Everyone,
I mostly work on site renovation and improvement projects, and I frequently deal with demolition quantities along with new construction quantities in the same area.
I would like some guidance on how to properly calculate demolition and new pavement quantities together in Trimble Business Center.
Here is my scenario:
-
Existing asphalt pavement removal: 15 inches thick for 220 SY
-
New asphalt pavement placement: 18 inches thick for 180 SY
-
Remaining area: 6 inches of topsoil (landscape)
-
Existing and proposed contour lines are almost the same throughout the site.
Since the existing and design surfaces are nearly matching, I am unsure how to correctly model and calculate:
-
The demolition quantity (asphalt removal)
-
The new pavement build-up
-
The landscape/topsoil placement
-
Any necessary elevation adjustments
How should I properly set up the surfaces and volume calculations so demolition and new pavement can be handled accurately in the same area?
How can I perform demolition takeoff directly from MSI Manager?
-
Can demolition be modeled as a negative depth item?
-
Or should it be handled through a separate condition layer?
-
What is the best practice to avoid conflicts between removal and new construction quantities?
I would really appreciate if someone could explain the correct method or workflow in TBC for this type of renovation project.
Thank you in advance!
------------------------------
Keith Delehanty
------------------------------