    Trying to insert points over markers in Revit and continue to get a message stating 1044 out of 1044 points were placed outside of the current view range....

    I have other markers in the same plan view that are working so why am I getting this error?

    I have modified to view range to be unlimited above and set it far below the level in play.

    It has worked on other levels as this is a 6 story building and I have currently prepared trimble points for levels 3 and below with no problem, but level 4 is giving me trouble.